top of page
PHOTOS
2024

The beginning of construction

Construction of baffle frames

Overhead View of Entire Baffle Structure

The beginning of construction
1/10
2023

Overview of the Marsh Project site post sediment deposition

Overview of the Marsh Project site post sediment deposition

Setting up the project sign at the end of Main Street

Overview of the Marsh Project site post sediment deposition
1/4
2022

2021 deposition site

Boat floating outside the sediment deposition area

The Marsh Restoration site

2021 deposition site
1/7
2021

The beginning of the dredging on the Red River

Geo tube being set up to help trap the dredged sediment being pumped into marsh

Overview of the path in between Red River and Netley-Libau Marsh

The beginning of the dredging on the Red River
1/6
bottom of page